Silver Bear Files Amended Mangazeisky Silver Project Technical Report - "The OSC review identified that the results of the M North PEA included inferred mineral resources with the results of the previously filed October 2016 Updated Feasibility Study (“Updated FS”). As the Company had determined that M North would be best developed through the integration into the Vertikalny mine plan and not developed as a stand-alone project, the M North PEA in the Amended Report is based on its indicated mineral resources only." More
- 08/28/17 | Item |


- Visit GoldReview.com -