Nevsun Announces Increased Zinc Production at Bisha in Q3 2017 - "Zinc recoveries further benefitted from the primary ore metallurgy improvement program onsite. Additionally, several boundary material stockpile trial campaigns resulted in strong zinc recovery at the expense of copper recovery as portions of this material are not amenable to copper flotation. The mobile fleet expansion at Bisha, announced in Q2 2017 and funded entirely through operating cash flow, is expected to be completed by the end of H1 2018." More
- 10/27/17 | Item |


- Visit GoldReview.com -